Disproportionate collapse
Contents |
[edit] Introduction
Disproportionate collapse (or progressive collapse) occurs in a building when the failure of one component leads to the progressive failure of a series of other components, often with catastrophic results. The effect is very similar to that seen in a game of Jenga, pictured.
[edit] Ronan Point
A well-known example occurred in Newham, East London in May 1968 at a new 22-storey block of flats called Ronan Point. The reinforced concrete building featured prefabricated external wall panels. Unfortunately, a gas explosion resulted in the progressive collapse of an entire corner of the tower block, which killed four people and injured 17 other residents. The cause of the explosion was a resident striking a match to boil water which ignited the gas that was leaking from a joint in a newly-installed cooker.
The explosion blew out the load-bearing flank walls, which had been supporting the four flats directly above, lifting the ceiling and floor slab. This resulted in a house-of-cards progressive collapse as the floors above became unsupported. For further details see Ronan point.
Progressive collapse can be exploited deliberately as a demolition method to ensure a relatively quick and economic collapse if it is known the construction will respond appropriately.
[edit] Building regulations
Requirement A3 of the Building Regulations 2010 states:
‘The building shall be constructed so that in the event of an accident the building will not suffer collapse to an extent disproportionate to the cause.’
In other words, had Ronan Point been constructed in line with requirement A3, the damage would have been restricted to the floor where the explosion took place. Reducing a building’s tendency to disproportionate collapse can be met by a range of constructions set out in Approved Document B of the Building Regulations.
[edit] Pancake collapse
In the US, the term ‘pancake collapse' is sometimes used to describe the phenomenon of progressive collapse. The term was first used to describe a structural failure in the Bronx, New York, in August 1980, where a fire had weakened a structure to the extent that the floors fell successively in on one another, i.e they ‘pancaked’ down.
A similar effect was seen at the destruction of the twin towers of the World Trade Center, New York in September 2001. The fire produced by the aircraft strikes resulted in the progressive failure of the floor system; although initiated by the attacks, this was later deduced to be the primary mode of structural failure in the steel frame buildings. A number of code changes were initiated as a result of the investigation, one of which was to increase by one hour the fire resistance of structural components.
The Institution of Structural Engineers (IStructE) has published a two-volume guide to structural robustness and disproportionate collapse in buildings:
- Practical guide to structural robustness and disproportionate collapse in buildings.
- Manual for the systematic risk assessment of high-risk structures against disproportionate collapse.
[edit] Related articles on Designing Buildings Wiki
- Adam Curtis - The Great British Housing Disaster.
- Approved Document A.
- British post-war mass housing.
- Creep
- De la Concorde overpass collapse.
- Defects in construction.
- Grenfell Tower fire.
- Modular buildings.
- Offsite manufacturing.
- Prefab bungalows.
- Prefabrication.
- Ronan Point.
- Structural failures.
- The structural condition of Easiform cavity-walled dwellings (BR 130).
[edit] External references
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.